Hardin Valley Educational Resource Center Renovation Tracker

A guide to the 2025-2026 renovation of the Hardin Valley Campus's Educational Resource Center (ERC).

Renovation Timeline

Please note that renovation timelines are subject to change. This guide will be updated as changes to timeline are announced.

Phase 1:

July:

  • Hardin Valley Campus Library's physical collection moves to the 3rd floor.
  • Collaborative seating from the Reference Room moves to ER 120.
  • Paralegal classrooms (ER 313 and ER 315) are set up.
  • Open Lab is moved to ER 319.

August: 

  • Academic Tutoring Center moves to the 2nd floor (ER 217).
  • A collaborative study area is established in ER 120.
  • Temporary office landscaping is placed on the 1st and 2nd floor of the ERC.
  • ER 126 transitions from an office space to a study room for students.
  • ER 324 and ER 326 become bookable study rooms for students

September:

  • Stay Strong Success Center moves from the Goins building to the 2nd floor of the ERC.

November: 

  • The Veteran Success Center moves to its new home in the J.L. Goins Administration building. New location: GN 151

December:

  • Testing Center moves to its new location on the 3rd floor (winter break)

Phase 2:

January:

  • Library personnel move into temporary offices on the first floor 
  • Renovations on Stay Strong's office space (ER 209) begin. Stay Strong's Center for First-Generation Student Success personnel move from ER 209 to cubicles (office cubicles to be determined).
  • Testing Center's 3rd floor location is available for students
  • Study rooms on the 2nd floor of the ERC are closed for renovation. 

February: 

  • Library offices undergo renovation.
  • Collaborative study space is moved from ER 120 to prepare for renovations.

June:

  • ER 123A and 123B (current Veteran's Lounge) becomes bookable study rooms for students.
  • 122D becomes a bookable study room for students.