Please note that renovation timelines are subject to change. This guide will be updated as changes to timeline are announced.
Summer 2025:
- Open Lab is moved to ER 319.
July
- Hardin Valley Campus Library's physical collection moves to the 3rd floor.
- Collaborative seating from the Reference Room moves to ER 120.
- Paralegal classrooms (ER 313 and ER 315) are set up.
August:
- Academic Tutoring Center moves to the 2nd floor (ER 217).
- A collaborative study area is established in ER 120.
- Temporary office landscaping is placed on the 1st and 2nd floor of the ERC.
- ER 126 transitions from an office space to a study room for students.
- ER 324 and ER 326 become bookable study rooms for students
Fall 2026
- Testing Center moves to its new location on the 3rd floor (winter break)
September
- Stay Strong Success Center moves from the Goins building to the 2nd floor of the ERC.
Spring 2026
January:
- Library office spaces undergo renovation
- Library personnel move into the cubicles in the Reference Room (ER 143)
- Career Development moves into the 2nd floor of the ERC
- Study rooms 228, 229, and 230 become unavailable for reservations
Summer 2026
June:
- ER 123A and 123B (current Veteran's Lounge) becomes bookable study rooms for students.
- 122D becomes a bookable study room for students.