Hardin Valley Educational Resource Center Renovation Tracker

A guide to the 2025-2026 renovation of the Hardin Valley Campus's Educational Resource Center (ERC).

Renovation Timeline

Please note that renovation timelines are subject to change. This guide will be updated as changes to timeline are announced.

Summer 2025:

  • Open Lab is moved to ER 319.

July

  • Hardin Valley Campus Library's physical collection moves to the 3rd floor.
  • Collaborative seating from the Reference Room moves to ER 120.
  • Paralegal classrooms (ER 313 and ER 315) are set up.

August: 

  • Academic Tutoring Center moves to the 2nd floor (ER 217).
  • A collaborative study area is established in ER 120.
  • Temporary office landscaping is placed on the 1st and 2nd floor of the ERC.
  • ER 126 transitions from an office space to a study room for students.
  • ER 324 and ER 326 become bookable study rooms for students

Fall 2026

  • Testing Center moves to its new location on the 3rd floor (winter break)

September

  • Stay Strong Success Center moves from the Goins building to the 2nd floor of the ERC.

Spring 2026

January:

  • Library office spaces undergo renovation
    • Library personnel move into the cubicles in the Reference Room (ER 143)
  • Career Development moves into the 2nd floor of the ERC
    • Study rooms 228, 229, and 230 become unavailable for reservations

Summer 2026

June:

  • ER 123A and 123B (current Veteran's Lounge) becomes bookable study rooms for students.
  • 122D becomes a bookable study room for students.